PPR-SSM: PERSONALIZED PAGERANK AND SEMANTIC SIMILARITY MEASURES FOR ENTITY LINKING


Automatic data processing system for integrated cost and schedule control of excavation works in NATM tunnels

A type-based system is widely used for cost and schedule control in the NATM (New Austrian Tunnelling Method) tunnel.This study raises several limitations of the type-based system: a broad level of control, a distributed approach to cost and schedule data, ad hoc management, and difficulty in Toilet Paper Holders deriving meaningful data.Integrated

read more